Home/Press/News/World's First Post-Combustion CCS Unit Begins Operation on FPSO Agogo
Oil & Gas·March 30, 2026·Source: Offshore Energy

World's First Post-Combustion CCS Unit Begins Operation on FPSO Agogo

Malaysia's Yinson Production has put into operation the carbon capture and storage (CCS) unit onboard its FPSO Agogo, making it the world's first post-combustion CO2 capture plant installed on an offshore facility. The milestone is the result of a collaboration with Azule Energy (a joint venture between Eni and BP) and Carbon Circle.

The CCS system runs on the open-source CESAR1 solvent, an advanced amine blend developed through years of academic research and global R&D. The system demonstrates low energy regeneration and high reaction rates, showing strong potential for large-scale offshore deployment.

The FPSO Agogo is located at Block 15/06 offshore Angola and has a production capacity of 120,000 barrels of oil per day. It is Angola's first carbon-neutral FPSO and the centerpiece of the Agogo Integrated West Hub project. Azule Energy holds a 36.84% stake, alongside Sonangol P&P (36.84%) and Sinopec International (26.32%).

The FPSO sailed away from Cosco Shipping Heavy Industry's shipyard in Shanghai in February 2025 and reached its destination off Angola in May 2025. Azule Energy said: "We truly believe that collaboration and innovation are key to accelerating the energy transition. This project stands as a powerful example of what our industry can accomplish when we work together to deliver tangible climate solutions offshore."